Jump to content

Day Log/1863-06-01

From Festipedia, hosted by the FR Heritage Group

On this date, the delivery of the first two locomotives was scheduled from George England. As it transpired, it was over a month later, on the 18th July before this occurred.[1]

References

[edit]
  1. ^ Lua error in Module:Citation/CS1/Configuration at line 747: attempt to index global 'lang_obj' (a nil value). p65

See also

[edit]