Day Log/1863-06-01

From Festipedia, hosted by the FR Heritage Group
Jump to navigation Jump to search

On this date, the delivery of the first two locomotives was scheduled from George England. As it transpired, it was over a month later, on the 18th July before this occurred.[1]

References[edit]

  1. ^ Boyd, James I.C. (1975) [1959]. The Festiniog Railway 1800 - 1974; Vol. 1 - History and Route. Blandford: The Oakwood Press. ISBN 0-8536-1167-X. OCLC 2074549. p65

See also[edit]